Due to work on the Civic Square Revitalization Project, access to the east side of Central Library at ground level will be closed temporarily. The closure is as a result of the construction of the Glass Pavilion beginning June 14, 2010.
Access to underground parking elevators on B1 and B2 as well as access to the west side of Central Library at ground level will not be affected. Clear wayfaring signage will be provided as needed. The period of construction is June 14, 2010 to mid-December 2010.
View the drawing:
http://www.mississauga.ca/file/COM/CNTdoorJune2010.pdf